Snap Draws DIY
is Now Available!

Snap Draws DIY makes your Rehab or Construction Draws process SIMPLE and FAST.

EZ Financial Group brings borrowers a new and improved construction draws process through Snap Draws DIY! Using Snap Draws DIY will help you get your projects+ reimbursed now. Snap Draws DIY provides:

CONVENIENCE

Take photos from your own phone through our portal app.No third-party inspection company necessary!

SPEED

Draws are processed within 24 hours from receiving your photos**.

TRANSPARENCY

Ability to track the progress or speak to an in-house draws specialist.

How it Works

1. Request Snap Draws

Contact us and start draw process to get Snap Draws submission link.

2. Snap Pictures

Snap pics of work in progress on your phone. No inspector!

3. Funds Wired

Receive funds – average turnaround time of 1 day!

How it Works

The Scope of Work (SOW) is the proposed list of work and valuations that will be performed at the property. The SOW is used to determine the economic viability of the project. It is also used to guide the reimbursements during the draws processes.

Provide details that clarify the scope. For example; ‘Roof: $1,000’, we don’t know what you are doing to the roof. If you add, ‘Repair south east corner’, or ‘Overlay shingles over garage’, then we have a much clearer understanding and can conclude the assessment faster and get money to you faster. Also, be prepared to provide receipts and documentation when asked. The typical receipts you get in the course of the project are sufficient.

Soft costs are planning, engineering, and permitting expenses. These include Architectural and Engineering fees, drawings, surveys, filing fees and permit fees, for example.

A contingency line item helps accounts for unexpected expenses and it can also prevent the need to amend the SOW.

Yes. Demolition is the tearing down of building materials. Trash Hauling is the removal of debris. If you separate these two items, we can fully reimburse your demolition scope even if you still need a dumpster on site.

Be prepared to provide all drawings, documents, permits, and paid invoices for all soft costs. These are our only way to know that this work has been accomplished.

Yes. Be prepared to provide receipts for all items in the Scope of Work.

Contingency can account for up to 10% of the total renovation budget.

Yes. If an error was made in the original SOW, you can amend the scope of work accordingly. Keep in mind that the revised SOW must continue to support the After Repair Value indicated in the appraisal. If the ARV was derived with the understanding that you were updating the kitchen and baths, those items must remain in the revised SOW.

No. The construction holdback cannot change after the loan is funded.

Generally, we reimburse for materials and labor used for permanent improvements to the property and the process work such as excavation and shoring that may enable the permanent improvements to be installed. We reimburse for planning efforts as well.

Insurances, overhead and profit, temporary power, lawn maintenance, staging, draw fees, interest fees, closing fees, project management, furniture, decorative light fixtures, etc.

Draws FAQ

Reimbursement for work completed at the site.
We need to know that the work has been done before we can reimburse you.

We use the photos to assess the progress of the work at the site.

Best practice is to provide comprehensive, general photos of the entire exterior and interior of the property. You can provide detailed (close-up) photos where required.
Yes. Sometimes we’ll ask for more photos especially for work that may have been completed and covered over in between draw processes. Rough plumbing, for example, can be installed and covered before a draw is requested.

In some cases, we ask for these because the photos from an inspection do not show that the work has been done.

For Snap Draw, we usually process the draw request within one business day from receipt of photos.
Yes. You can decide which process you would like to use for your draw.
Single unit inspections are $270 with a $30 wire fee.

Snap Draw processing is $300 with no added wire fee.

Processing Snap Draws is technologically and labor intensive.
No. Construction holdback is released on a reimbursement basis. However, we can reimburse for soft costs prior to work being done at the site.

Currently, single unit projects qualify. Fix & Flips, Tear downs, Ground Ups.

No, not yet. We are working on enhancing the systems to allow Snap Draws on Multi-family projects.

Contact EZFinancial Group Today

We’re on a mission to help over 100,000 real estate entrepreneurs find real growth through building Fundable businesses and accessing capital.

Contact

15400 Grand River Ave, Detroit,
MI 48227, USA

© 2024 · EZFinancialGroup · Developed by SonyStudio